logo
ProjectGc Bidding

Wastewater Treatment System Upgrade Phase 1

Gc bidding · Quebec · Last reported Apr 2024

Source: Dodge USA

Diversion and maintenance work during the work, until the new structures and equipment are put into operation; Demolition of the measuring chamber building and scrapping of existing equipment and adjustment of the existing manhole; The establishment of an exploration well; The development of a new prefabricated flow measurement chamber and its accessories; The construction of a shed for the measur

Status
Under Construction
Sector
Commercial, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Government
Location
Quebec, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Wastewater Treatment System Upgrade Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wastewater Treatment System Upgrade Phase 1” is an infrastructure initiative in the Commercial sector, located in Quebec, Quebec, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Diversion and maintenance work during the work, until the new structures and equipment are put into operation; Demolition of the measuring chamber building and scrapping of existing equipment and adjustment of the existing manhole; The establishment of an exploration well; The development of a new prefabricated flow measurement chamber and its accessories; The construction of a shed for the measuring chamber as well as the required architectural work; Electrical and ventilation work in the ne...

Procurement method

Budget

Location

Country

Canada

State

Quebec

City

Quebec

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Government

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project