Wastewater Treatment Upgrading
Sector: Water Supply and Storage • Location: British Columbia, Canada
Source: Infrastructure Canada
The project will construct a headworks building and increase the lagoons within the wastewater treatment system to increase the level of treatment and capacity and ensure that biochemical oxigen demand (BOD) and total suspended solides (TSS) levels are in year round compliance of the Districts operating permit. The District has an influx of people through the area during the summer tourist season
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project will construct a headworks building and increase the lagoons within the wastewater treatment system to increase the level of treatment and capacity and ensure that biochemical oxigen demand (BOD) and total suspended solides (TSS) levels are in year round compliance of the Districts operating permit. The District has an influx of people through the area during the summer tourist season which has resulted in the levels being exceeded during the times of heavy usage. The project will expand the wastewater treatment plants lagoon system by converting a previously abandoned lagoon to a become an aerated lagoon and will also construct a sludge laydown area. The project works will include: - Construction of a headworks screening building including: - Installation of a headworks screening system; - Installation of a washer/compactor; - Installation of a flow meter and chamber; - Installation of ventilation and odor control; - Installation of all electrical, plumbing, connections and appurtenances related to the construction of the headworks screening building; - Construction of a geotube laydown area including fencing; - Conversion of an abandoned facultative lagoon to an aerated lagoon; - Installation of cell inlet and outlet chambers, bypass piping, lagoon liner; - Installation of a sludge drying sand bed; - Installation of underlaid perforated drainpipe system; and - All related civil, mechanical, and electrical appurtenances. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
