logo
ProjectDropped

Water and Energy Project

One of 427 projects Taiyo tracks in Guinea-Bissau.

Source: World Bank Group

The project objectives of the Water and Energy Project are (a) to carry out institutional reform in the water and electricity sectors; (b) to build institutional capacity by strengthening the Ministry of Rural Development, Natural Resources and Environment (MDRRNA) and the Secretary of State for Energy (SEE); (c) to provide reliable and potable water supply in Bissau and secondary centers on a sus

Status
Failure
Sector
Water Supply and Storage, Power Transmission, Oil and Gas, Power Generation (CCGT), Waste Processing and Treatment, Government
Location
Guinea-Bissau
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Water and Energy Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Water and Energy Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Guinea-Bissau. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

dropped

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project objectives of the Water and Energy Project are (a) to carry out institutional reform in the water and electricity sectors; (b) to build institutional capacity by strengthening the Ministry of Rural Development, Natural Resources and Environment (MDRRNA) and the Secretary of State for Energy (SEE); (c) to provide reliable and potable water supply in Bissau and secondary centers on a sustainable basis through cost recovery, and improve the pluvial drainage system in Bissau; and (d) to enable the power sector to provide an economic and reliable supply of electricity to the largest number of people, and thus support the conditions for sustainable economic growth. The main components of the project are: (a) institutional reform of the electricity and water sectors, including the financing of a social and reserve fund to pay for overstaffing of the utility during the transition period and for government arrears for water and electricity bills; (b) secondary centers; (c) rehabilitation and extension of existing power generation and generation and distribution facilities in Bissau and secondary centers, the environmental clean-up of the oil spill behind the plant Electricity and Water Utility of Guinea-Bissau (EAGB- Electricidade e Aguas de Guine-Bissau), and the development of the traditional energy sector; and (d) rehabilitation and extension of the pluvial drainage system in Bissau.

Original sector

Energy and Extractives,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Guinea-Bissau

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Oil and Gas, Power Generation (CCGT), Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project