logo

Water and Energy Project

Sector: Water Supply and Storage • Location: Guinea-Bissau

Source: World Bank Group

Project
Dropped

The project objectives of the Water and Energy Project are (a) to carry out institutional reform in the water and electricity sectors; (b) to build institutional capacity by strengthening the Ministry of Rural Development, Natural Resources and Environment (MDRRNA) and the Secretary of State for Energy (SEE); (c) to provide reliable and potable water supply in Bissau and secondary centers on a sus

Project Information FAQ

Project Information

5 Q
The project “Water and Energy Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Guinea-Bissau. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

dropped

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project objectives of the Water and Energy Project are (a) to carry out institutional reform in the water and electricity sectors; (b) to build institutional capacity by strengthening the Ministry of Rural Development, Natural Resources and Environment (MDRRNA) and the Secretary of State for Energy (SEE); (c) to provide reliable and potable water supply in Bissau and secondary centers on a sustainable basis through cost recovery, and improve the pluvial drainage system in Bissau; and (d) to enable the power sector to provide an economic and reliable supply of electricity to the largest number of people, and thus support the conditions for sustainable economic growth. The main components of the project are: (a) institutional reform of the electricity and water sectors, including the financing of a social and reserve fund to pay for overstaffing of the utility during the transition period and for government arrears for water and electricity bills; (b) secondary centers; (c) rehabilitation and extension of existing power generation and generation and distribution facilities in Bissau and secondary centers, the environmental clean-up of the oil spill behind the plant Electricity and Water Utility of Guinea-Bissau (EAGB- Electricidade e Aguas de Guine-Bissau), and the development of the traditional energy sector; and (d) rehabilitation and extension of the pluvial drainage system in Bissau.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data