logo

Water and sanitation in four regions, Phase III - Drinking water supply in Niangoloko

Sector: Government • Location: Burkina-Faso

Source: KFW Bank aus Verantwortung

Project
Active

Core problem Almost five million Burkinabe have no access to safe drinking water and more than fourteen million have no access to adequate sanitation. The effort required by the population to access clean drinking water is characterized by long distances to the nearest tap, interruptions in supply and long waiting times. Hygienically adequate toilets are often far away. Municipal wastewater treatm

Project Information FAQ

Project Information

5 Q
The project “Water and sanitation in four regions, Phase III - Drinking water supply in Niangoloko” is an infrastructure initiative in the Government sector, located in Burkina-Faso. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Core problem Almost five million Burkinabe have no access to safe drinking water and more than fourteen million have no access to adequate sanitation. The effort required by the population to access clean drinking water is characterized by long distances to the nearest tap, interruptions in supply and long waiting times. Hygienically adequate toilets are often far away. Municipal wastewater treatment is usually non-existent. As a result, the hygiene situation is precarious, particularly in densely populated cities, and compliance with adequate hygiene standards is not possible. Module objective The aim of the FC module is to ensure a sustainable year-round supply of previously undersupplied cities in the Boucle du Mouhoun, Cascades, Hauts-Bassins and Sud-Ouest regions with hygienically safe water and adequate wastewater disposal. Key outputs The town of Niangoloko is to be connected to a supply line from Banfora. In addition, the town of Soubakaniédougou is to be connected by an extension of the line and six villages that lie along the water line. Target group The target group is the population of the city of Niangoloko in the Cascades region. Niangoloko has an above-average population growth. The limited availability of groundwater in the region will probably no longer be able to ensure the drinking water supply from groundwater wells alone from 2025 onwards. Contribution to the national implementation of Agenda 2030 The project contributes to the achievement of Sustainable Development Goals 6 (Enable availability of water and sanitation) and 11 (Design inclusive and sustainable cities and urban planning).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data