Water and Sewer System, Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
Project includes the continuation of the water distribution system and the start of the sanitary sewer system. Chlorination building complete with single power transmission line, water transmission main. Sanitary sewer system will include sewer line, 2 communal septic tanks, 2 sanitary sewer outfalls and 62 homes serviced.
- Status
- Closed
- Sector
- Water Supply and Storage, Seaport, Power Generation (CCGT), Commercial, Waste Processing and Treatment
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Water and Sewer System, Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project includes the continuation of the water distribution system and the start of the sanitary sewer system. Chlorination building complete with single power transmission line, water transmission main. Sanitary sewer system will include sewer line, 2 communal septic tanks, 2 sanitary sewer outfalls and 62 homes serviced. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Seaport, Power Generation (CCGT), Commercial, Waste Processing and Treatment |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
