Water and Wastewater Infrastructure (Area 1b)
Sector: Water Supply and Storage • Location: Alberta, Canada
Source: Dodge USA
Install 150mm HDPE wastewater force main (180m by HDD, 295m by open trench in existing ROW) and associated valves and fittings. Install Air Release valve (in new manhole) and pig receiver (in new manhole). Connection between two existing force mains (from existing stub to existing stub).
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water and Wastewater Infrastructure (Area 1b)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Install 150mm HDPE wastewater force main (180m by HDD, 295m by open trench in existing ROW) and associated valves and fittings. Install Air Release valve (in new manhole) and pig receiver (in new manhole). Connection between two existing force mains (from existing stub to existing stub). |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Alberta |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
