Water and Wastewater Rehabilitation, including Pump System, Chemical Feed Systems, Instrumentation Equipment, Distribution System, Sewage System and General Building Maintenance and Equipment
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
#1: Update Supervisory Control and Data Acquisition (SCADA) computer tower at Manitowaning water treatment plant (WTP) but services Sunsite System and Lagoon operation as well, affects 326 users. #2: Replace defective pressure tank and inline pH probe at Sunsite Estates WTP (64 users), install timer on raw water sample pump at Manitowaning WTP (326 users) #3: Certify beam used as lifting device to
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | #1: Update Supervisory Control and Data Acquisition (SCADA) computer tower at Manitowaning water treatment plant (WTP) but services Sunsite System and Lagoon operation as well, affects 326 users. #2: Replace defective pressure tank and inline pH probe at Sunsite Estates WTP (64 users), install timer on raw water sample pump at Manitowaning WTP (326 users) #3: Certify beam used as lifting device to lift raw water screen from well at Manitowaning WTP, replace eyewash station tempering valve and install wall thermostat at Sunsite WTP #4: Repair pre-chlorine configuration unit at Sunsite WTP (64 users) and re-purpose Alum board for Zebra Mussel in both WTPs (326 users). #5: Rebuild filter discharge piping on 2 filters at Manitowaning WTP (262 users). #6: SWOB distribution system (326 users affected). #7: Repair sump pump and ground fault circuit interrupter (GFCI) for raw sewage flow meter chamber, replace shaft assembly for aerator #6, conduct sludge survey for both cells at Sewage Facility (262 users affected). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
