logo

Water and Wastewater Rehabilitation, including Pump System, Chemical Feed Systems, Instrumentation Equipment, Distribution System, Sewage System and General Building Maintenance and Equipment

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

#1: Update Supervisory Control and Data Acquisition (SCADA) computer tower at Manitowaning water treatment plant (WTP) but services Sunsite System and Lagoon operation as well, affects 326 users. #2: Replace defective pressure tank and inline pH probe at Sunsite Estates WTP (64 users), install timer on raw water sample pump at Manitowaning WTP (326 users) #3: Certify beam used as lifting device to

Project Information FAQ

Project Information

4 Q
The project “Water and Wastewater Rehabilitation, including Pump System, Chemical Feed Systems, Instrumentation Equipment, Distribution System, Sewage System and General Building Maintenance and Equipment” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

#1: Update Supervisory Control and Data Acquisition (SCADA) computer tower at Manitowaning water treatment plant (WTP) but services Sunsite System and Lagoon operation as well, affects 326 users. #2: Replace defective pressure tank and inline pH probe at Sunsite Estates WTP (64 users), install timer on raw water sample pump at Manitowaning WTP (326 users) #3: Certify beam used as lifting device to lift raw water screen from well at Manitowaning WTP, replace eyewash station tempering valve and install wall thermostat at Sunsite WTP #4: Repair pre-chlorine configuration unit at Sunsite WTP (64 users) and re-purpose Alum board for Zebra Mussel in both WTPs (326 users). #5: Rebuild filter discharge piping on 2 filters at Manitowaning WTP (262 users). #6: SWOB distribution system (326 users affected). #7: Repair sump pump and ground fault circuit interrupter (GFCI) for raw sewage flow meter chamber, replace shaft assembly for aerator #6, conduct sludge survey for both cells at Sewage Facility (262 users affected).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data