logo
ProjectBid Results

Water Control Structure Interim Repairs

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Interim Repairs for Water Control Structure at Echo Lake Dam Synopsis: The scope of work is to provide construction services to conduct repairs at the water control structure at the Echo Lake Dam to extend the structure for an approximate 10 year period. The specific scope includes: (a) Removal of sand bags and metal debris, and relocation of sediment on the existing control structure slab; (b) Re

Status
Closed
Sector
Metal, Water Supply and Storage, Hydro, Government, Commercial, Waste Processing and Treatment
Location
Regina, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Water Control Structure Interim Repairs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Water Control Structure Interim Repairs” is an infrastructure initiative in the Metal sector, located in Regina, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Interim Repairs for Water Control Structure at Echo Lake Dam Synopsis: The scope of work is to provide construction services to conduct repairs at the water control structure at the Echo Lake Dam to extend the structure for an approximate 10 year period. The specific scope includes: (a) Removal of sand bags and metal debris, and relocation of sediment on the existing control structure slab; (b) Replacement of all existing wooden bearing blocks within the stoplog/gate slots with new wooden bea...

Procurement method

Budget

Location

Country

Canada

State

Saskatchewan

City

Regina

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Water Supply and Storage, Hydro, Government, Commercial, Waste Processing and Treatment

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project