logo
ProjectBid Results

Water Control Structure Replacement

One of 10,000+ projects Taiyo tracks in Idaho.

Source: Dodge USA

The project is located at the Boundary-Smith Creek WMA, approximately 28 miles northwest of Bonners Ferry, Boundary County, Idaho. It consists of removing and disposing of two (2) round, corrugated-metal water control structures and replacing them with rectangular, precast concrete structures. Deep excavations and shoring are anticipated, and ground water is likely to be encountered. A third struc

Status
Closed
Sector
Commercial, Metal, Water Supply and Storage, Cement, Government, Manufacturing (Industrial), Waste Processing and Treatment
Location
Boise, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Water Control Structure Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Water Control Structure Replacement” is an infrastructure initiative in the Commercial sector, located in Boise, Idaho, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is located at the Boundary-Smith Creek WMA, approximately 28 miles northwest of Bonners Ferry, Boundary County, Idaho. It consists of removing and disposing of two (2) round, corrugated-metal water control structures and replacing them with rectangular, precast concrete structures. Deep excavations and shoring are anticipated, and ground water is likely to be encountered. A third structure is included as an additive option to the base bid.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Boise

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Metal, Water Supply and Storage, Cement, Government, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project