logo

Water Distribution System and water treatment plant up-grades & Wastewater Feasibility Study

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Sagamok has consulted several water/wastewater engineering companies over the last 10 years, detailing the current deficiencies. Sagamok has obtained Class "B" estimates for the upgrades to the SCADA system, pump replacement, highlift station, water tower cleaning and watermain repairs. This will be re-visited and up-dated. The wastewater lagoon was inspected by a Health Canada Environment Health

Project Information FAQ

Project Information

3 Q
The project “Water Distribution System and water treatment plant up-grades & Wastewater Feasibility Study” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Sagamok has consulted several water/wastewater engineering companies over the last 10 years, detailing the current deficiencies. Sagamok has obtained Class "B" estimates for the upgrades to the SCADA system, pump replacement, highlift station, water tower cleaning and watermain repairs. This will be re-visited and up-dated. The wastewater lagoon was inspected by a Health Canada Environment Health Officer. Sagamok’s first step is to proceed to a feasibility study as Sagamok’s residential, governance and private industry growth has to be accounted for when addressing the wasterwater capacity of the community, evaluating the case of a communal system with treatment facility versus the current method of a septic tank and field bed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data