Water Distribution System Improvements Phase I
Sector: Water Supply and Storage • Location: Saint Paul, Minnesota, United States of America
Source: Dodge USA
The work includes the following approximate quantities for construction: 8-Inch Water main Ductile Iron CL 52 1350 LF 1-Inch Type K Copper Pipe 100 LF Pressure Reducing Station 1 EA 12-Inch CMP 65 LF Rock Excavation 600 CY Bituminous Pavement 550 TONS Bituminous Curb 675 LF Traffic Control 1 LS
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Government, Metal, Steel
- Location
- Saint Paul, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Distribution System Improvements Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes the following approximate quantities for construction: 8-Inch Water main Ductile Iron CL 52 1350 LF 1-Inch Type K Copper Pipe 100 LF Pressure Reducing Station 1 EA 12-Inch CMP 65 LF Rock Excavation 600 CY Bituminous Pavement 550 TONS Bituminous Curb 675 LF Traffic Control 1 LS |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Saint Paul |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Government, Metal, Steel |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
