Water Distribution System Jackson Barracks
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project includes full enclosure, and possible additions to, the existing pump house as necessary to fully protect the existing equipment, and to provide mechanical, electrical, plumbing and building insulation as required. Additional work includes, but is not limited to, the replacement of existing non-functional pumps and instrumentation that is requiring upgrades or is nearing obsolescence,
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Power Generation (CCGT), Consumer Products, Geothermal, Raw Materials, Manufacturing (Industrial)
- Location
- New Orleans, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Distribution System Jackson Barracks
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes full enclosure, and possible additions to, the existing pump house as necessary to fully protect the existing equipment, and to provide mechanical, electrical, plumbing and building insulation as required. Additional work includes, but is not limited to, the replacement of existing non-functional pumps and instrumentation that is requiring upgrades or is nearing obsolescence, the addition of a booster pump near Area C of Jackson Barracks as required, the addition of a new... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | New Orleans |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Power Generation (CCGT), Consumer Products, Geothermal, Raw Materials, Manufacturing (Industrial) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
