Water Expansion Study
Pre-design · Kansas · Last reported Jul 2024
Source: Dodge USA
Hire a firm to determine the feasibility, cost, and to plan the expansion of our current water supply to include water hookups at each of the electrified camping pads at East Park and West Park camp grounds. The Harvey County may be seeking a consultant to provide design and planning services for the Water Expansion Study
- Status
- Prospective
- Sector
- Car parking, Water Supply and Storage, Government, Automotive, Commercial, Waste Processing and Treatment
- Location
- Kansas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Expansion Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Hire a firm to determine the feasibility, cost, and to plan the expansion of our current water supply to include water hookups at each of the electrified camping pads at East Park and West Park camp grounds. The Harvey County may be seeking a consultant to provide design and planning services for the Water Expansion Study |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Water Supply and Storage, Government, Automotive, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
