Water Group 525C Replacement
Planning schematics · California · Last reported Oct 2024
Source: Dodge USA
Construction of approximately 2,024 linear feet (0.38 miles) of 16-inch pipe to replace existing asbestos cement (AC) water mains. Construction of approximately 1,676 linear feet (0.32 miles) of new 12 and 16-inch pipe. Privatize approximately 1,524 linear feet (0.29 miles) of existing 6 and 16-inch AC and cast iron (CI) water mains. Abandonment of 5,699 linear feet (1.08 miles) of existing CI, AC
- Status
- Prospective
- Sector
- Metal, Government, Water Supply and Storage, Waste Processing and Treatment, Steel, Commercial
- Location
- San Diego, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Group 525C Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construction of approximately 2,024 linear feet (0.38 miles) of 16-inch pipe to replace existing asbestos cement (AC) water mains. Construction of approximately 1,676 linear feet (0.32 miles) of new 12 and 16-inch pipe. Privatize approximately 1,524 linear feet (0.29 miles) of existing 6 and 16-inch AC and cast iron (CI) water mains. Abandonment of 5,699 linear feet (1.08 miles) of existing CI, AC, and polyvinyl chloride (PVC) water mains. City of San Diego, may be seeking a consultant to pro... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Government, Water Supply and Storage, Waste Processing and Treatment, Steel, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
