logo
ProjectBidding

Water Improvements Phase 2A

Bidding · California · Last reported Sep 2024

Source: Dodge USA

Location, Description, and Completion of Work: This project is located in the City of Folsom, Sacramento County, along East Bidwell Street, Oak Avenue Parkway, and at the City of Folsom Water Treatment Plant located at 194 Randall Drive, Folsom, CA. The work to be done is shown on the Plans, and generally consists of, but is not limited to, furnishing all labor, materials, and equipment to install

Status
Prospective
Sector
Road, Government, Metal, Commercial, Residential, Waste Processing and Treatment, Water Supply and Storage, Steel
Location
Folsom, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Water Improvements Phase 2A

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Water Improvements Phase 2A” is an infrastructure initiative in the Road sector, located in Folsom, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Location, Description, and Completion of Work: This project is located in the City of Folsom, Sacramento County, along East Bidwell Street, Oak Avenue Parkway, and at the City of Folsom Water Treatment Plant located at 194 Randall Drive, Folsom, CA. The work to be done is shown on the Plans, and generally consists of, but is not limited to, furnishing all labor, materials, and equipment to install approximately 19,600 linear feet of 24-inch ductile iron pipe or welded steel pipe transmission ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Folsom

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Government, Metal, Commercial, Residential, Waste Processing and Treatment, Water Supply and Storage, Steel

Article published date

2024-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project