Water Infrastructure Master Plan
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Engineering services to support the implementation of the Water Infrastructure Master Plan. These services will be provided under contract with the Town of Scotia, with funding provided in whole or in part by the South Carolina Rural Infrastructure Authority (RIA) under RIA State Grant #P-25-5033. Engineering services to support the implementation of the Water Infrastructure Master Plan. These ser
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government
- Location
- Scotia, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Water Infrastructure Master Plan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Engineering services to support the implementation of the Water Infrastructure Master Plan. These services will be provided under contract with the Town of Scotia, with funding provided in whole or in part by the South Carolina Rural Infrastructure Authority (RIA) under RIA State Grant #P-25-5033. Engineering services to support the implementation of the Water Infrastructure Master Plan. These services will be provided under contract with the Town of Scotia, with funding provided in whole or ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Scotia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
