logo

Water Infrastructure Upgrades

Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada

Source: Infrastructure Canada

Project
Completed

The project consists of the installation of a new pump control system in the George’s Brook Pumphouse which will include new Variable Frequency Drive (VFD) controls, making the system more energy efficient and reliable. The scope of the work includes: - Installing a new intake pipe, infiltration gallery and screens complete with an air burst system. This will reduce the amount silt build up in the

Project Information FAQ

Project Information

5 Q
The project “Water Infrastructure Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Newfoundland and Labrador, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the installation of a new pump control system in the George’s Brook Pumphouse which will include new Variable Frequency Drive (VFD) controls, making the system more energy efficient and reliable. The scope of the work includes: - Installing a new intake pipe, infiltration gallery and screens complete with an air burst system. This will reduce the amount silt build up in the intake line. - Adding a new back up diesel generator and improvements to the existing building by adding a proper exhaust and ventilation system. - Connecting the 440m water main between the pumphouse road and Ellis Road which was installed during the first phase. The project aims to improve the reliability, energy efficiency and quality of the pumping system and water intake system. Additionally, the new trunk main and isolation valves will reduce the risk of leaks in the existing system and make troubleshooting more efficient. The Project will benefit the residents of the Town of George’s Brook-Milton by increasing access to potable water.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data