Water Intake Structure Coating & Raw Waterline Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The scope of work for the project shall include blasting and painting surfaces above the water in containment, cleaning, waxing and wrapping the steel piers below the water level and replacing the 30-inch raw water supply line on the structure.
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Government, Waste Processing and Treatment, Commercial, Metal
- Location
- Lewisville, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Water Intake Structure Coating & Raw Waterline Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work for the project shall include blasting and painting surfaces above the water in containment, cleaning, waxing and wrapping the steel piers below the water level and replacing the 30-inch raw water supply line on the structure. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Lewisville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Government, Waste Processing and Treatment, Commercial, Metal |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
