Water intake Upgrade
Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
There will be 40 metres of existing perforated intake pipe removed and new intake pipe installed with a 6mm intake screen at the mouth. This screen will be protected by heat tracing equipment installed. This option was decided on after much discussion with other towns experiencing same problem and our consulting.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Water intake Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | There will be 40 metres of existing perforated intake pipe removed and new intake pipe installed with a 6mm intake screen at the mouth. This screen will be protected by heat tracing equipment installed. This option was decided on after much discussion with other towns experiencing same problem and our consulting. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
