Water Interconnection with Transmission Main & Water Servi
Sector: Commercial • Location: Coulterville, Illinois, United States of America
Source: Dodge USA
The Project includes the following Work: Furnish all labor, materials, and equipment required to provide a new source of finished water by connecting to the City of Sparta water system at IL Rt. 4 and Kelly Road to Coultervilles water system, a booster pump station & chemical feed building, remove and replace all water service meters, provide an advanced metering infrastructure system, and all app
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Road, Government, Waste Processing and Treatment
- Location
- Coulterville, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Interconnection with Transmission Main & Water Servi
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Furnish all labor, materials, and equipment required to provide a new source of finished water by connecting to the City of Sparta water system at IL Rt. 4 and Kelly Road to Coultervilles water system, a booster pump station & chemical feed building, remove and replace all water service meters, provide an advanced metering infrastructure system, and all appurtenances. The work shall be completed in accordance with the specifications and plans covering ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Coulterville |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Road, Government, Waste Processing and Treatment |
Article published date | 2023-05-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
