logo

Water level optimisation at March with special attention to climate change

Sector: Water Supply and Storage • Location: Austria

Source: Keep.EU

Project
Closed

The project aims to present the impact of climate change on March and set measures in the estuary for an improved water balance. As a result, the habitat in the main river and in the foreland benefits for people and nature. By means of hydraulic measures, the water level is to be raised in the riverbed of the March in the low waterways during the months without precipitation, especially in summer.

Project Information FAQ

Project Information

5 Q
The project “Water level optimisation at March with special attention to climate change” is an infrastructure initiative in the Water Supply and Storage sector, located in Austria. Taiyo aggregates data on it from Keep.EU.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project aims to present the impact of climate change on March and set measures in the estuary for an improved water balance. As a result, the habitat in the main river and in the foreland benefits for people and nature. By means of hydraulic measures, the water level is to be raised in the riverbed of the March in the low waterways during the months without precipitation, especially in summer. This makes this area sustainable and significantly enhances the low-structural flow. Synergies of the Kli-Ma project arise particularly with Austrian-Slovak INTERREG projects such as Prodam, BAUM2020 or the project MreNa — Leisure Shipping on March. But the results from the EU-funded LIFE+ project Renaturation Lower March-Auen as well as findings from Austrian-Czech projects such as a currently submitted climate project are also taken into account.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data