Water Line Project Package 2
Sector: Water Supply and Storage • Location: Odessa, Texas, United States of America
Source: Dodge USA
The major work will consist of the following items: Locating and Coordination with Existing Utilities 14 , 8 , and 6 DIPS DR-11 HDPE By Open Cut 24 Steel Casing By Other Than Open Cut 12 , 8 , and 6 Gate Valves and Boxes Line Stop Valves Fire Hydrant Assemblies 1 Combination Air Valves Misc. Surface Repair Asphalt Concrete
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The major work will consist of the following items: Locating and Coordination with Existing Utilities 14 , 8 , and 6 DIPS DR-11 HDPE By Open Cut 24 Steel Casing By Other Than Open Cut 12 , 8 , and 6 Gate Valves and Boxes Line Stop Valves Fire Hydrant Assemblies 1 Combination Air Valves Misc. Surface Repair Asphalt Concrete |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
