Water Line Replacement Phase 3B
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The contractor is to furnish and install approximately 801 linear feet of 12-inch PVC water line, 4,947 linear feet of 8-inch PVC water line, 1,070 linear feet of 6-inch PVC water line and 145 linear feet of 4-inch PVC water line, including all steel casing, as shown on drawings, fittings, valves, connections, fire hydrant assemblies and associated appurtenances. Construction shall be all trenchle
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Road, Government, Metal, Commercial, Residential, Waste Processing and Treatment
- Location
- Humble, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Line Replacement Phase 3B
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The contractor is to furnish and install approximately 801 linear feet of 12-inch PVC water line, 4,947 linear feet of 8-inch PVC water line, 1,070 linear feet of 6-inch PVC water line and 145 linear feet of 4-inch PVC water line, including all steel casing, as shown on drawings, fittings, valves, connections, fire hydrant assemblies and associated appurtenances. Construction shall be all trenchless unless noted otherwise. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Humble |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Road, Government, Metal, Commercial, Residential, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
