Water Line Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The principal items of work are detailed herein below: 1. Install 11,650 LF 3 HDPE, IPS, SDR 11 Pipe 2. Connect to Existing water line at Station 0+00, Line #10 to 6 PVC 3. Connect to Existing water line at Station 27+08, Black Top Road to 2 PVC
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
- Location
- Quinton, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Line Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The principal items of work are detailed herein below: 1. Install 11,650 LF 3 HDPE, IPS, SDR 11 Pipe 2. Connect to Existing water line at Station 0+00, Line #10 to 6 PVC 3. Connect to Existing water line at Station 27+08, Black Top Road to 2 PVC |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Quinton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
