Water Main and Service Line Replacement
Sector: Water Supply and Storage • Location: Bear Valley Springs, California, United States of America
Source: Dodge USA
In general, the Work consists of constructing Bear Valley Community Services District water system improvements, including but not limited to water mains totaling approximately 650 feet of 4- inch PVC C900 pipe and approximately 20 water service lines of 1-inch pipe, blow-offs, together with all fittings, valves, and appurtenances, as well as abandoning existing watersystem and permanent trench re
- Status
- Closed
- Sector
- Water Supply and Storage, Seaport, Government, Commercial, Waste Processing and Treatment
- Location
- Bear Valley Springs, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Main and Service Line Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the Work consists of constructing Bear Valley Community Services District water system improvements, including but not limited to water mains totaling approximately 650 feet of 4- inch PVC C900 pipe and approximately 20 water service lines of 1-inch pipe, blow-offs, together with all fittings, valves, and appurtenances, as well as abandoning existing watersystem and permanent trench resurfacing for Port Royal Ct. and Aqua Villa Ct. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Bear Valley Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Seaport, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
