logo
ProjectClosed

Water Main Construction

One of 10,000+ projects Taiyo tracks in Massachusetts.

Source: Dodge USA

This bid consists of the installation and maintenance of above ground temporary water pipes, the removal of old, unlined cast iron water mains and the installation of new 6 , 8 and 12 polyethylene wrapped, zinc coated ductile iron water main including all associated water service and hydrant connections on various streets throughout the City as per the specifications of the DPWP. ARPA Funded.

Status
Closed
Sector
Water Supply and Storage, Road, Chemical (Industrial), Commercial, Manufacturing (Industrial), Waste Processing and Treatment, Metal, Government, Steel
Location
Worcester, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Water Main Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Water Main Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Worcester, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This bid consists of the installation and maintenance of above ground temporary water pipes, the removal of old, unlined cast iron water mains and the installation of new 6 , 8 and 12 polyethylene wrapped, zinc coated ductile iron water main including all associated water service and hydrant connections on various streets throughout the City as per the specifications of the DPWP. ARPA Funded.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Worcester

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Chemical (Industrial), Commercial, Manufacturing (Industrial), Waste Processing and Treatment, Metal, Government, Steel

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project