Water Main Extension
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project includes the following Work: Installation of approximately 2785 linear feet of new 12-inch water main, using the traditional open-cut trenching methods, Horizontal Direction Drilling (HDD), and bore methods, to connect the existing 12-inch line on 183rd Street west to Nall Ave, and all appurtenant work as specified.
- Status
- Prospective
- Sector
- Water Supply and Storage, Raw Materials, Commercial, Road, Government
- Location
- Stilwell, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Main Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Installation of approximately 2785 linear feet of new 12-inch water main, using the traditional open-cut trenching methods, Horizontal Direction Drilling (HDD), and bore methods, to connect the existing 12-inch line on 183rd Street west to Nall Ave, and all appurtenant work as specified. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Stilwell |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Commercial, Road, Government |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
