Water Main Extension
One of 10,000+ projects Taiyo tracks in Nebraska.
Source: Dodge USA
- Install the proposed water main from Revere Ln. to Pine Lake Rd. 2. Isolate existing water mains and make connection to existing 16 water main at Station 107+20.15 (Pine Lake Rd.) 3. Test, disinfect and flush all mains through the temporary and proposed hydrants shown on the plans.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Raw Materials
- Location
- Lincoln, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Main Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Install the proposed water main from Revere Ln. to Pine Lake Rd. 2. Isolate existing water mains and make connection to existing 16 water main at Station 107+20.15 (Pine Lake Rd.) 3. Test, disinfect and flush all mains through the temporary and proposed hydrants shown on the plans. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Lincoln |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Raw Materials |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
