Water Main Improvements Area 1
Sector: Road • Location: Fort Lauderdale, Florida, United States of America
Source: Dodge USA
This project includes the following: bringing the 54-inch water main on NW 38th Street back into service; adding approximately 400 feet of 30-inch discharge from the Peele Dixie Water Treatment Plant high service pumps to the old west existing 30-inch discharge; and upsizing approximately 100 feet of 36-inch and 30-inch from the 42-inch reducer to the intersection of NE 37th Street and NE 11th Ave
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project includes the following: bringing the 54-inch water main on NW 38th Street back into service; adding approximately 400 feet of 30-inch discharge from the Peele Dixie Water Treatment Plant high service pumps to the old west existing 30-inch discharge; and upsizing approximately 100 feet of 36-inch and 30-inch from the 42-inch reducer to the intersection of NE 37th Street and NE 11th Avenue with 42-inch water mains. The City of Fort Lauderdale may be seeking a consultant to prepare ... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States of America
- Bothell Everett Highway Overlay Project
- 102nd Ave NE Downtown Access Improvements
- Beardslee Blvd Widening
- 228th St SE Overlay (2nd Ave SE to 9th Ave SE) Project
- 2023 Citywide Pedestrian Safety Improvements Project
- NE 188th St Non-Motorized Improvements
- 2019-ADA Curb Ramps
- NE 185th St Utility Improvements Project
