Water Main Improvements
Sector: Water Supply and Storage • Location: Tifton, Georgia, United States of America
Source: Dodge USA
The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Tyson Ave., Love Ave., & Poplar St. Water Main Improvements as shown on the construction drawings. In general, construction consists of installing 1,825 L.F. of 8 PVC Water Main and 600 LF of 6 PVC Water Main, connection to existing water main via tapping sleeve and valve, erosion
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Tifton, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Main Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Tyson Ave., Love Ave., & Poplar St. Water Main Improvements as shown on the construction drawings. In general, construction consists of installing 1,825 L.F. of 8 PVC Water Main and 600 LF of 6 PVC Water Main, connection to existing water main via tapping sleeve and valve, erosion control, traffic control and all associated measures for the complete project. Time allotted for... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Tifton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
