Water Main Lining Pilot Project Mc-5174
Closed · California · Last reported Apr 2023
Source: Dodge USA
The Work consists of all work related to installing a cured-in-place NSF61 approved pressure pipe liner in an existing 6-inch cast iron water main along the Alley east of Cherry Avenue between 15th street and Pacific Coast Highway, Alley east of Sherman Place between 15th street and Pacific Coast Highway, and a new 6-inch ductile iron water main along 17th street between Cherry Avenue and Alley ea
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Road, Government, Steel, Commercial, Waste Processing and Treatment
- Location
- Long Beach, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Main Lining Pilot Project Mc-5174
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work consists of all work related to installing a cured-in-place NSF61 approved pressure pipe liner in an existing 6-inch cast iron water main along the Alley east of Cherry Avenue between 15th street and Pacific Coast Highway, Alley east of Sherman Place between 15th street and Pacific Coast Highway, and a new 6-inch ductile iron water main along 17th street between Cherry Avenue and Alley east of Sherman Place. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Long Beach |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Road, Government, Steel, Commercial, Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
