Water Main Looping Project
Sector: Water Supply and Storage • Location: Evanston, Wyoming, United States of America
Source: Dodge USA
The work shall include all labor, material, equipment, testing, disinfection, and quality assurance necessary to complete the turnkey project which includes the replacement of an existing water main with 2010 L.F. of 12 diameter C-900 pipe and approximately 50 L.F. of 6 diameter C-900 pipe related to hydrant installations. Three fire hydrants with auxiliary valves, restrained joints, fittings, val
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment
- Location
- Evanston, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Main Looping Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work shall include all labor, material, equipment, testing, disinfection, and quality assurance necessary to complete the turnkey project which includes the replacement of an existing water main with 2010 L.F. of 12 diameter C-900 pipe and approximately 50 L.F. of 6 diameter C-900 pipe related to hydrant installations. Three fire hydrants with auxiliary valves, restrained joints, fittings, valves, and thrust blocks. The work also includes but is not limited to all incidental items require... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Evanston |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
