Water main phase 2

Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada

Source: Infrastructure Canada

Project
Pre-Construction

Project consists of upgrading the watermain in the Town of Point Leamington. The scope of the project includes the replacement of 900m of watermain, including 35 services to curbstop in the town of point leamington. Project aims to improve the functionality of our water services

Status
Prospective
Sector
Water Supply and Storage
Location
Newfoundland and Labrador, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Water main phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Water main phase 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Newfoundland and Labrador, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project consists of upgrading the watermain in the Town of Point Leamington. The scope of the project includes the replacement of 900m of watermain, including 35 services to curbstop in the town of point leamington. Project aims to improve the functionality of our water services

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Newfoundland and Labrador

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage

Article published date

2026-06-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project