Water main replacement on Thornton Rd. from Champlain Ave. to 300 m North, Whitby
Sector: Metal • Location: Ontario, Canada
Source: Infrastructure Canada
This project will be replacing 0.3 km of old ductile iron water main with new Polyvinyl Chloride (PVC) water main. The water main services a commercial/industrial area of The Town Whitby and is looped as part of the ultimate distribution system to provide system security and improved water quality.
- Status
- Closed
- Sector
- Metal, Manufacturing (Industrial), Water Supply and Storage, Commercial
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Water main replacement on Thornton Rd. from Champlain Ave. to 300 m North, Whitby
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will be replacing 0.3 km of old ductile iron water main with new Polyvinyl Chloride (PVC) water main. The water main services a commercial/industrial area of The Town Whitby and is looped as part of the ultimate distribution system to provide system security and improved water quality. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Metal, Manufacturing (Industrial), Water Supply and Storage, Commercial |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
