logo
ProjectClosed

Water Main Replacement Phase #2

One of 10,000+ projects Taiyo tracks in Tennessee.

Source: Dodge USA

The Project consists of replacing approximately 16,870 linear feet (LF) of water main in downtown Loudon, Tennessee. The water main will be constructed of ductile iron pipe ranging from 4-inch to 12-inch in size. The project includes but is not limited to valves, fittings, hydrants and other appurtenances as shown on the Drawings and required for a complete functioning system. The selected contrac

Status
Closed
Sector
Metal, Water Supply and Storage, Road, Government, Steel, Commercial, Waste Processing and Treatment
Location
Loudon, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Water Main Replacement Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Water Main Replacement Phase 2” is an infrastructure initiative in the Metal sector, located in Loudon, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of replacing approximately 16,870 linear feet (LF) of water main in downtown Loudon, Tennessee. The water main will be constructed of ductile iron pipe ranging from 4-inch to 12-inch in size. The project includes but is not limited to valves, fittings, hydrants and other appurtenances as shown on the Drawings and required for a complete functioning system. The selected contractor for the project will be solely responsible for the development, implementation and maintenanc...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Loudon

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Water Supply and Storage, Road, Government, Steel, Commercial, Waste Processing and Treatment

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project