Water Main Replacement Phase #2
One of 10,000+ projects Taiyo tracks in Tennessee.
Source: Dodge USA
The Project consists of replacing approximately 16,870 linear feet (LF) of water main in downtown Loudon, Tennessee. The water main will be constructed of ductile iron pipe ranging from 4-inch to 12-inch in size. The project includes but is not limited to valves, fittings, hydrants and other appurtenances as shown on the Drawings and required for a complete functioning system. The selected contrac
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Road, Government, Steel, Commercial, Waste Processing and Treatment
- Location
- Loudon, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Main Replacement Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of replacing approximately 16,870 linear feet (LF) of water main in downtown Loudon, Tennessee. The water main will be constructed of ductile iron pipe ranging from 4-inch to 12-inch in size. The project includes but is not limited to valves, fittings, hydrants and other appurtenances as shown on the Drawings and required for a complete functioning system. The selected contractor for the project will be solely responsible for the development, implementation and maintenanc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Loudon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Road, Government, Steel, Commercial, Waste Processing and Treatment |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
