Water Main Replacement Program
One of 10,000+ projects Taiyo tracks in Illinois.
Source: Dodge USA
Replace existing water main based on the recommendation of the 2013 Water Distribution Hydraulic Analysis Report. The report recommends that water mains should be replaced at an average rate of 2.3 miles per year. The City of Snoqualmie may be seeking a consultant to provide design for Water Main Replacement Program.
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government, Waste Processing and Treatment
- Location
- Wheaton, Illinois, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Main Replacement Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replace existing water main based on the recommendation of the 2013 Water Distribution Hydraulic Analysis Report. The report recommends that water mains should be replaced at an average rate of 2.3 miles per year. The City of Snoqualmie may be seeking a consultant to provide design for Water Main Replacement Program. |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Wheaton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Waste Processing and Treatment |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
