Water Main Replacement Project in Madison
Sector: Water Supply and Storage • Location: Madison, Connecticut, USA
Source: Patch
A water main replacement project is underway in Madison, conducted by the Connecticut Water Company on Scotland Avenue and River Edge Farms Road. The work started on Scotland Avenue and moved to River Edge Farms Road, with reclamation scheduled for Flintlock Road and East Wharf Road starting April 9, 2026. Paving for these roads is expected to begin on April 20, 2026, followed by milling and pavin
- Status
- Under Construction
- Sector
- Water Supply and Storage, Road
- Location
- Madison, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Patch
ConstructChat
Ask ConstructChat about Water Main Replacement Project in Madison
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A water main replacement project is underway in Madison, conducted by the Connecticut Water Company on Scotland Avenue and River Edge Farms Road. The work started on Scotland Avenue and moved to River Edge Farms Road, with reclamation scheduled for Flintlock Road and East Wharf Road starting April 9, 2026. Paving for these roads is expected to begin on April 20, 2026, followed by milling and paving on Linden Lane, Fence Creek Drive, Old Post Road/Birnbaum Lane, and Winter Hill Road. |
Original sector | Utilities |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Madison |
Source
Source | Patch |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in USA
- Replacement of Badger Turbo Meters
- Golf Maintenance Building - Water Heater
- Replaced a 2" domestic water line
- Chill Water Pump Issue
- Pilot Program to Increase Water Supply
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
- SR A1A/Collins Ave from 44 St to 4700 blk and Indian Creek from 41 St to 44 St and SR 112/W 41 St over the Indian Creek Waterway bridge
- Replace 3" domestic water meter located in mechanical room 088
