Water Main Replacements
Sector: Power Transmission • Location: Bellevue, Washington, United States of America
Source: Dodge USA
The Work contemplated to be per-formed under this contract is as follows: Construct approximately 8,200 LF of ductile iron water mains o Construct approximately' 2,700 LF of ERDIP water mains, coordinate with supplier as required. Install new fire hydrant assemblies, Install replacement water services, Install individual PRAPs, Relocate existing utilities as required, Abandon asbestos cement pipe,
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Work contemplated to be per-formed under this contract is as follows: Construct approximately 8,200 LF of ductile iron water mains o Construct approximately' 2,700 LF of ERDIP water mains, coordinate with supplier as required. Install new fire hydrant assemblies, Install replacement water services, Install individual PRAPs, Relocate existing utilities as required, Abandon asbestos cement pipe, Restore surface conditions, including asp :halt trench patching, concrete curbs, gutters and sid... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Transmission projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
- LOT-12 MAIN HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
- LOT-7 HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC. UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- LOT-4 MAIN HOUSE(PLAN 1A),2-STOREY SFR W/ ASSOC. UTIL./LDSCP TOTAL AREA: LIVING 2256 SF,GARAGE 437,PORCH 41; 4 BED/3 BATH
