logo
ProjectAwarded

Water Meter and Endpoint Replacement Project

The owner, status and timeline of this project. A free account opens every field.

Source: Folsom Times

The project involves replacing approximately 2,950 smaller 5/8-inch by 3/4-inch Sensus water meters with newer city-supplied one-inch Badger water meters throughout the city of Folsom. It also includes replacing associated Zenner meter endpoints, customer notification, and data collection tied to the city's automated meter reading system. This is part of an ongoing effort to modernize Folsom's wat

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Power Generation (CCGT)
Location
Folsom, California, United States of America
Updated
22 Jul 2026
Source
Folsom Times

ConstructChat

Ask ConstructChat about Water Meter and Endpoint Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Water Meter and Endpoint Replacement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Folsom, California, United States. Taiyo aggregates data on it from Folsom Times.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves replacing approximately 2,950 smaller 5/8-inch by 3/4-inch Sensus water meters with newer city-supplied one-inch Badger water meters throughout the city of Folsom. It also includes replacing associated Zenner meter endpoints, customer notification, and data collection tied to the city's automated meter reading system. This is part of an ongoing effort to modernize Folsom's water infrastructure and improve long-term billing reliability and conservation tracking.

Original sector

Water Infrastructure

Budget

Location

Country

United States of America (USA)

State

California

City

Folsom

Source

Source

Folsom Times

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Power Generation (CCGT)

Article published date

2026-05-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project