Water Meter Replacement Phase II
Closed · Illinois · Last reported Sep 2025
Source: Dodge
The Scope of Work as part of this Request for Bids (RFB) will be the removal of existing water meters, located either in the valve box or valve vault in City right-of-way or the resident s home, and replacement with smart water meters. The City has the right-of-entry into residents homes to perform this work.
- Status
- Closed
- Sector
- Water Supply and Storage, Residential, Waste Processing and Treatment, Government, Commercial
- Location
- Harvey, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Water Meter Replacement Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Scope of Work as part of this Request for Bids (RFB) will be the removal of existing water meters, located either in the valve box or valve vault in City right-of-way or the resident s home, and replacement with smart water meters. The City has the right-of-entry into residents homes to perform this work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Harvey |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Waste Processing and Treatment, Government, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
