Water Meter Testing Calibration & Repairs
Sector: Manufacturing (Industrial) • Location: Sanford, Florida, United States of America
Source: Dodge USA
he meters will be tested in accordance with the manufacturer s recommendations and/or the guidelines recommended by AWWA. 1. Perform initial testing of existing domestic and fire line water meters 3 -10 . If meters can be calibrated into tolerance, do so at the time of testing. 2. Each unit must be inspected and tested within five business days of the service request to determine the operating con
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | he meters will be tested in accordance with the manufacturer s recommendations and/or the guidelines recommended by AWWA. 1. Perform initial testing of existing domestic and fire line water meters 3 -10 . If meters can be calibrated into tolerance, do so at the time of testing. 2. Each unit must be inspected and tested within five business days of the service request to determine the operating condition and accuracy of the selected meter. 3. All necessary parts for repair must be provided by ... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Manufacturing (Industrial) projects in United States of America
- Beardslee Blvd Widening
- 2019-ADA Curb Ramps
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- LEGALIZE/CONSTRUCT REAR BATHROOM ADDITION 67 SQ.FT.
- TRACT 8304- BUILDING 12- UNIT 1204-PLAN B2E-ALT-4BD/3BA 2025 SQ FT LIVING,472 GARAGE,11 PORCH, 0 DECK
- VERIZON ANTENNA MODIFICATIONS TO EXISTING TOWER MOUNTED AND GROUND MOUNTED EQUIPMENT
