Water Plant Booster Pump Replacement
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge USA
Removal of existing booster pumps, piping, valves, electrical equipment, and related appurtenances and installation of new booster pumps, piping, valves, electrical service rack with ATS and electrical equipment, with all related appurtenances.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Plant Booster Pump Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal of existing booster pumps, piping, valves, electrical equipment, and related appurtenances and installation of new booster pumps, piping, valves, electrical service rack with ATS and electrical equipment, with all related appurtenances. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
