Water Plant Electrical
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge USA
Scope - The Work of the Contract is for demolition and construction of above ground booster pump piping, replacement of booster pumps and motors, removal of existing control equipment, installation of new control equipment, and various improvements to Control Building #1.
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Plant Electrical
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Work of the Contract is for demolition and construction of above ground booster pump piping, replacement of booster pumps and motors, removal of existing control equipment, installation of new control equipment, and various improvements to Control Building #1. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
