Water Plant No. 1 Phase 1
Sector: Water Supply and Storage • Location: Houston, Texas, United States of America
Source: Dodge
One (1) 1,000 GPM gravel water well and one (1) 500 GPM gravel water well. (including test hole, driller's log, analysis of drill cuttings, drift indicator survey, electric log, gas log, water quality sampling as requested by the Engineer, evaluations report, multi-shot alignment survey) One (1) 474,000 gallon welded steel ground storage tank Two (2) 15,000 gallon hydropneumatic tanks Four (4) boo
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Steel, Government, Metal
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Water Plant No. 1 Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | One (1) 1,000 GPM gravel water well and one (1) 500 GPM gravel water well. (including test hole, driller's log, analysis of drill cuttings, drift indicator survey, electric log, gas log, water quality sampling as requested by the Engineer, evaluations report, multi-shot alignment survey) One (1) 474,000 gallon welded steel ground storage tank Two (2) 15,000 gallon hydropneumatic tanks Four (4) booster pumps MCC/Operation building Disinfection building and equipment Electrical, switch gear, ge... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Steel, Government, Metal |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
