Water Pollution Control Plant Addition
Sector: Water Supply and Storage • Location: Tennille, Georgia, United States of America
Source: Dodge USA
The work to be done consists of furnishing all materials, equipment and labor for the construction of: SBR basins, elevated headworks, rehabilitation of existing structures, blower building, pump replacement, site grading, sidewalks, equipment, electrical, coatings, and all appurtenances. Time allotted for construction is 425 consecutive calendar days.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work to be done consists of furnishing all materials, equipment and labor for the construction of: SBR basins, elevated headworks, rehabilitation of existing structures, blower building, pump replacement, site grading, sidewalks, equipment, electrical, coatings, and all appurtenances. Time allotted for construction is 425 consecutive calendar days. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
