Water Pressure Reduction Project - Phase 2 REBID
Sector: Water Supply and Storage • Location: Lynnwood, Washington, United States of America
Source: Dodge USA
The purpose of this project is to: Install six pressure reducing valve stations and associated site piping and appurtenances. Install approximately 900 linear feet of 12-inch ductile iron water main and approximately 430 linear feet of 8-inch ductile iron water main on 208th Street SE SR 524 near the intersection of the Bothell Everett Highway SR 527. Install approximately 40 linear feet of 8-inch
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Commercial, Road, Government, Waste Processing and Treatment, Steel
- Location
- Lynnwood, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Water Pressure Reduction Project - Phase 2 REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this project is to: Install six pressure reducing valve stations and associated site piping and appurtenances. Install approximately 900 linear feet of 12-inch ductile iron water main and approximately 430 linear feet of 8-inch ductile iron water main on 208th Street SE SR 524 near the intersection of the Bothell Everett Highway SR 527. Install approximately 40 linear feet of 8-inch ductile iron water main on 183rd Street SE at the intersection of the Bothell Everett Highway SR... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Lynnwood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Commercial, Road, Government, Waste Processing and Treatment, Steel |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
