logo

Water Quality Control Facilities Improvements Design

Sector: Commercial • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
Complete / Design

The combined sewer system located in a 15-square-mile area of the City, which is centered in downtown Atlanta. The combined sewer area includes the North Avenue, Tanyard Creek, Clear Creek and Custer Avenue Combined Sewer Basins. During some storm events, combined sewer flows that exceed the downstream Water Reclamation Center (WRC) treatment capacity and the ability of the collection and transmis

Project Information FAQ

Project Information

5 Q
The project “Water Quality Control Facilities Improvements Design” is an infrastructure initiative in the Commercial sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete / design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The combined sewer system located in a 15-square-mile area of the City, which is centered in downtown Atlanta. The combined sewer area includes the North Avenue, Tanyard Creek, Clear Creek and Custer Avenue Combined Sewer Basins. During some storm events, combined sewer flows that exceed the downstream Water Reclamation Center (WRC) treatment capacity and the ability of the collection and transmission system storage facilities is directed to either Water Quality Control Facilities (WQCFs) or Combined Sewer Control Facilities (CSCFs) for treatment. The City owns and operates two WQCFs four CSCF’s, and one combined sewer Regulator facility. These facilities operate under two separate National Pollutant Elimination System (NPDES) permits. One permit covers the East Area Facilities which discharge into the South River basin; a separate permit covers the West Area Facilities which discharge into the Chattahoochee River basin. In 2014, a task order was awarded to an Architectural/Engineering Joint Venture to prepare designs for renewal and replacement of aging, outdated or nonfunctioning equipment at each WQCF. The scope of this project includes: Evaluating renewal and replacement requirements at WQCFs Preparing preliminary and detailed designs Preparing opinions of probable construction costs Grouping projects into short-term and long-term priorities Preparing bid documents for most critical equipment at WQCFs Justification: Replaces aging, outdated or nonfunctioning equipment at WQCFs Design improvements facilitate compliance with permit requirements Improves efficiency and reliability Improves safety at facilities

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data