logo

Water Recycling Plan for Boise River

Sector: Fertilizers • Location: Eagle, Idaho, United States

Source: Waste 360

Project
Planned

The City of Eagle, Idaho has partnered with the Farmer’s Union Ditch Company to recycle treated wastewater into the Boise River. This initiative aims to treat the water to meet Class A standards for landscape irrigation and crop watering, addressing the importance of water conservation.

Status
Prospective
Sector
Fertilizers, Water Supply and Storage
Location
Eagle, Idaho, United States of America
Updated
22 Jul 2026
Source
Waste 360

ConstructChat

Ask ConstructChat about Water Recycling Plan for Boise River

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Water Recycling Plan for Boise River” is an infrastructure initiative in the Fertilizers sector, located in Eagle, Idaho, United States. Taiyo aggregates data on it from Waste 360.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Eagle, Idaho has partnered with the Farmer’s Union Ditch Company to recycle treated wastewater into the Boise River. This initiative aims to treat the water to meet Class A standards for landscape irrigation and crop watering, addressing the importance of water conservation.

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Eagle

Source

Source

Waste 360

URL

More Details

Record type

Project

Sector

Fertilizers, Water Supply and Storage

Article published date

2025-04-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project