Water Resources Management Project
Closed · Mexico
Source: World Bank Group
The general objectives of the Water Resources Management Project are to: 1) promote conditions for environmentally sustainable, economically efficient and equitably allocated use of water resources in Mexico; 2) support the integrated comprehensive management of water resources; and 3) increase the benefits and reduce the risk related to existing hydraulic infrastructure. Secondary project objecti
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Hydro, Government
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Water Resources Management Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The general objectives of the Water Resources Management Project are to: 1) promote conditions for environmentally sustainable, economically efficient and equitably allocated use of water resources in Mexico; 2) support the integrated comprehensive management of water resources; and 3) increase the benefits and reduce the risk related to existing hydraulic infrastructure. Secondary project objectives are to: 1) support groundwater conservation by reducing overexploitation and contamination; 2) promote the restoration of surface water quality; 3) improve meteorological services for improved water management and for the society and economy as a whole; 4) reduce flood damages downstream of reservoirs; 5) improve dam safety; 6) improve allocation of water as an economic good; 7) promote decentralization of water resources management through the establishment and strengthening of river basin councils; 8) improve water resources planning through the development of the hydrographic region plans with river basin council participation; and 9) improve water rights administration through registry of water rights users and improved fee collection. The project will comprise the following components: 1) institutional development, technological support and training; 2) water quantity and quality monitoring improvement and assessment; 3) reservoir operation, dam safety and aquifer management improvement; 4) water rights administration; and 5) water resources planning and river basin council support. |
Original sector | FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Mexico
- Norte III Combined Cycle Power Plant Chihuahua
- Samalayuca II CCGT Plant Chihuahua Mexico
- Tuxtla Gutierrez Wastewater Treatment Plant - Phase I
- Lerdo Wastewater Treatment Plant
- Cancun Recycling & Waste Processing Plant
- SSA Car Terminal Lazaro Cardenas
- Veracruz and Medellin Water and Sewerage Services
- Tuxpan Container Terminal
